Base Camp Lenk

Published by

on

2009-02_ch_ 087_resize.jpg
Thanks to Annemarie we were able to stay in Lenk im Simmental.
2009-02_ch_ 066_resize.jpg
2009-02_ch_ 018_resize.jpg
In front of all 200 school children we presented our project TOPtoTOP and were amazed about their relation to sport and the environment.
2009-02_ch_ 004_resize.jpg
2009-02_ch_109_resize.JPG
Matteo Micheli joined us for presentations at the SuisseNautik boat show and arrived with a Genaker for Pachamama!
2009-02_ch_ 044_resize.jpg
2009-02_ch_116_resize.JPG
While one of us was busy at the boat show, the other half went skiing, ice-skating, sledging or building a snow man with our kids. In Lenk was also the Synchro Ski World Cup!
Matthias Kurt from the Lenker mountain railways organized us a public presentation and sponosred us ski tickets. Result: 3 year old Salina skis in all terains like a rocket and it is hard to keep up with her and 2 year old Andri skis already alone in easy slopes.
2009-02_ch_ 022_resize.jpg
2009-02_ch_ 054_resize.jpg
Thanks to our parents, who went skiing with our kids. We both were able to work together with Marc Zollinger on the book and Dario also as a mountain guide.
2009-02_ch_ 049_resize.jpg
2009-02_ch_ 050_resize.jpg
2009-02_ch_ 052_resize.jpg
2009-02_ch_ 051_resize.jpg
On the last weekend we climbed together with the TOPtoTOP board over the glacier to the Summit of Mount Pizol. Sabine climed to the mixed top already in the 5th month of her pregnancy.
2009-02_ch_131_resize.JPG
Today is Sabine’s birthday and tomorrow we are on the way to Pachamama.
… and finally we were able to test our kite material for Antarctica thanks to Dominik and Sylke.
20090221_kite_bernina_pluse2_006.jpg
Next weekend we are back at the Gold Coast City Marina in Brisbane to paint the deck of Pachamama and prepare for the SGS venue at the 18th of March.

Blog Archives